Laserfiche WebLink
..i <br /> RECLAMATION PLAN PAGE FIVE <br /> 2. Please see map. <br /> 3. The reclamation will be concurrent with the project operation. <br /> C. POST MINING TOPOGRAPHY: <br /> 1. See map <br /> 2. See map <br /> 3. The project will mainly be free of any slopes except for the dirt farm <br /> roads used for farming when project has been completed. These inter <br /> field roads are only to be two feet in height with a 3:1 slope <br /> D. IMPOUNDMENTS: There are no impoundments regaurding this project. <br /> E. DRAINAGE: The natural drainage or fall will remain in the same direction <br /> for the majority of this project. The drainage and irrigating <br /> process will be greatly enhanced. The disturbed land will <br /> be replanted in row crops. <br /> F. DISPOSITION OF OLD EQUIPMENT: No buildings of any type will be <br /> erected and the loader, bulldozer, etc <br /> will be transported from site at <br /> completion of project. Nothing will <br /> remain behind. <br /> G. REVEGETATION: <br /> 1. The topsoil will be replaced by laser guided land leveling type scrapers, <br /> the topsoil over field#4 and phrase 11 of the original permit approved <br /> San Joaquin County Redevelopment Department GX 96-6 will now be <br /> at a depth of five feet. The ground once it has been leveled will be overly <br /> compacted and thus will be deep ripped to loosen the ground. <br /> H. MONITORING AND MAINTENANCE: <br /> 3. Reeves Sand& Topsoil Co. is the operator of this quarry and coordinator <br /> of the reclamation work and will remain as such for the period of time <br /> approved for this quarry permit by the State of California and the <br /> County of San Joaquin. <br />