Laserfiche WebLink
h. REPLACEMENT OF TOPSOIL The topsoil shall be set aside, and upon completion of <br /> an excavation, the topsoil shall be replaced and the site leveled in conformance with the <br /> excavation permit. (Development Title Section 9-1415.3[g]) <br /> I WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance <br /> with instructions from the Agricultural Commissioner of San Joaquin County. <br /> (Development Title Section 9-1415.3[h]) <br /> i SETBACKS: No excavation shall take place within 25 feet of any property line or right-of- <br /> way or within 200 feet of the toe of the levee of Whiskey Slough. (Development Title <br /> Section 9-1415.30]) <br /> k TEMPORARY CUT SLOPES AT SETBACK LINES: The temporary cut slope shall not <br /> exceed one (1) foot horizontal to one (1) foot vertical. <br /> I FINAL SLOPES: Final slopes shall not exceed three (3) feet horizontal to one (1)foot <br /> vertical. The minimum slope stability factors shall comply with requirements of <br /> Development Title Section 9-1415.3(k)(4). <br /> m EXCAVATION/RECLAMATION SCHEDULE The reclamation plan shall show the <br /> phases of excavation. Reclamation of the phase of an excavation shall be initiated prior <br /> to the start of the next excavation phase. The final reclamation of any phase of <br /> excavation shall be completed within two years of the commencement of the reclamation <br /> process. Excavation shall be limited so that at any point of time a maximum of one phase <br /> is being reclaimed while one phase is being excavated. (Development Title Section 9- <br /> 1415.3[o]) <br /> n. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues in compliance with the approved Permit but not longer than the end <br /> of year 2002. (Development Title Section 9-1415.3[p]) <br /> 0 ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br /> reclamation plan. The County may use professional services as provided for in Section 9- <br /> 240.11. The consultant shall be selected by San Joaquin County. Upon completion of <br /> the annual inspection, the person in charge of the mining operation shall submit to the <br /> State Geologist and the County a report which shall contain all the information as required <br /> by Section 2207 of the Public Resources Code. The cost of the inspection shall be paid <br /> by the mine operator. Additional inspections may be conducted, but the cost of additional <br /> inspections shall be paid for by the mine operator only if non-compliance with the <br /> conditions of the Quarry Excavation Permit or the reclamation plan is found. <br /> (Development Title Section 9-1415.3[q]) <br /> p. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance <br /> with conditions of approval, and compliance with County and State mining regulations, the <br /> applicant shall provide performance guarantees as a condition of the issuance of the <br /> Quarry Excavation Permit. The amount and form of the guarantee shall be subject to <br /> annual review and approval by the County and the State, and the amount shall be <br /> adequate to ensure reclamation of disturbed land and/or land to be disturbed during a <br /> given phase The annual review of the financial guarantee shall be coordinated with the <br /> San Joaquin County QX-98-2\Torlai <br /> Community Development Page 7 <br />