Laserfiche WebLink
annual inspection and approval of successive reclamation security so that the guarantee <br /> includes the amount of land previously determined by Development Services Division's <br /> annual inspection to have been reclaimed. The performance guarantee shall be in the <br /> form of either(1) a surety bond, (2) a trust fund with the lead agency, or(3) an irrevocable <br /> letter of credit. Any interest accrued in a trust fund shall stay with the trust fund account. <br /> The financial guarantee shall be payable to"San Joaquin County or the Department of <br /> Conservation" under the applicable provisions of the County and State mining regulations. <br /> q. GROUNDWATER CONDITIONS: The excavation shall not extend to depths below the <br /> groundwater level of the uppermost aquifer. (Development Title Section 9-1415.3[u)) <br /> r. CULTURAL RESOURCES: The excavator shall ease all construction and excavation <br /> work immediately upon the discovery of cultural resource materials. Such work shall <br /> cease until the excavator has complied with the requirements of Appendix K of the CEQA <br /> Guidelines. <br /> S. NOISE: The excavator shall implement the following measures to reduce the impact of <br /> construction-related noise: <br /> (1) All equipment shall have sound control devices no less effective than those <br /> provided on the original equipment. No equipment shall have exhaust systems <br /> without mufflers. <br /> t. LANDSCAPING AND SCREENING: The Landscaping/Screening Plan requirement shall <br /> be considered satisfied by planting corn or other similar height crop to screen the <br /> excavation from McDonald Road and Davini Road. (Development Title Section 9- <br /> 1415.3[m)) <br /> U. INDEMNIFICATION: The owner shall defend, indemnify, and hold harmless the local <br /> agency or its agents, officers, and employees from any claim, action, or proceeding <br /> against the local agency or its agents, officers, or employees to attack, set aside, void, or <br /> annual an approval of the local agency, advisory agency, appeal board, or legislative <br /> body concerning this quarry excavation permit. <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Gabe Karam, 468-3000) <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer or Land Surveyor <br /> and include the following: <br /> (1) 1[)At;;*' a The access road approach shall be <br /> paved. <br /> (2) Haul route. <br /> (3) Stockpile area for topsoil (no excavation or stockpile shall be allowed within 25 <br /> feet of road rights-of-way). <br /> b. Loads on all public roads shall be restricted to legal loads only. (Street and Highway Title <br /> Section 10-2350) <br /> San Joaquin County QX-98-2\Torlai <br /> Community Development Page 8 <br />