Laserfiche WebLink
Table 3. Summary of Impacts and Mitigation Measures <br /> Level of Significance Level of Significance <br /> Impact without Mitigation Mitigation Measure with Mitigation <br /> Vegetation <br /> 1. Loss of appropmately 12 acres of annual IS No mitigation is required. is <br /> grassland <br /> 2. Loss of oak trees S Prepare an oak protection plan and IS <br /> submit to the county before homesite <br /> approval. Follow the oak revegetation <br /> mitigation measures and monitoring plan <br /> described in this report. <br /> 3. Construction-related impacts on wetlands S Avoid all construction within the riparian LS <br /> community and establish a 100-foot <br /> W <br /> buffer from the canopy edge. <br /> .� Establish a 50-foot buffer around <br /> freshwater marsh and open water <br /> habitats. <br /> Maintain open water habitat by continued <br /> pumping into the lakes. <br /> Establish a 100-foot buffer from the edge <br /> of each vernal pool. <br /> 4. Potential impacts on special-status plants PS See impact and mitigation measure 3 LS <br /> that may occur in project wetland <br /> habitats <br />