Laserfiche WebLink
ATTACHMENT B <br /> Air pollutants resulting from the project will be minor and temporary during the <br /> construction of the project as they relate to dust and equipment exhaust. Dust will be <br /> mitigated by the use of water sprayers,up to 30 additional vehicle trips per day will be <br /> generated during construction. With the addition of a large freezer the number of vehicle <br /> trips by hatchery staff to the site will be reduced by up to three trips per week. Currently, <br /> staff travels back and forth to Rancho Cordova for frozen fish food. The large freezer <br /> will eliminate vehicle trips. <br /> W:WSWOADTROMCTSUllIFF\ 513&C <br />