Laserfiche WebLink
AMENDED <br /> CONDITIONS OF APPROVAL. <br /> SA-90--20 <br /> INTERMOD INDUSTRIES , INC. <br /> Unless otherwise specified , all conditions of approval shall <br /> be complied with prior to the issuance of any building <br /> permits . <br /> 1 . PUBLIC WORKS DEPARTMENT <br /> a . An Improvement Plan, prepared by a registered Civil r <br /> Engineer , showing drainage, driveway access details , <br /> on-site parking , existing and proposed utility <br /> services , and grading, shall be submitted to the <br /> Department of Public Works for approval . <br /> b. The frontage improvement for McKinley Avenue shall be <br /> constructed in conformance with the standards for an <br /> 84-foot right-of-way industrial street . The <br /> construction of the frontage improvements will be <br /> deferred upon execution by the owner of a Deferred <br /> Frontage Improvement Agreement prior to approval of the <br /> Improvement Plan (A $250 .00 fee is required for <br /> processing per Ord. No. 3337 in addition to a copy of <br /> the Grant Deed and an Engineer ' s estimate with a <br /> drawing of the required frontage improvements on a form <br /> to be supplied by the Public Works Department) . <br /> C. An Encroachment Permit shall be required for work <br /> within the road right-of-way. <br /> d . The Traffic Impact Mitigation Fee will be required for <br /> this development. (The fee currently is $1 , 894 per <br /> 1 , 000 gross square feet of building for a <br /> classification of 7324 . The fee shall be automatically <br /> adjusted annually by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> Resolution R-89-946 suspends the fee until February 1 , <br /> 1990 . <br /> e. Public water service shall be required for the <br /> development . <br /> 2 . PUBLIC HEALTH SERVICES <br /> a. Connection to an approved public water supply system is <br /> required. A letter from the water supplier will be <br /> rd- <br /> required stating that they have the capacity to serve <br /> the development and that the system meets State <br /> standards prior to recording the final map. <br />