My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
10979
>
2600 - Land Use Program
>
MS-01-24
>
SU0000017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:27:32 AM
Creation date
9/6/2019 10:10:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000017
PE
2622
FACILITY_NAME
MS-01-24
STREET_NUMBER
10979
Direction
N
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
8/8/2001 12:00:00 AM
SITE_LOCATION
10979 N MICKE GROVE RD
RECEIVED_DATE
7/10/2001 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MICKE GROVE\10979\MS-01-24\SU0000017\APPL.PDF \MIGRATIONS\M\MICKE GROVE\10979\MS-01-24\SU0000017\CDD OK.PDF \MIGRATIONS\M\MICKE GROVE\10979\MS-01-24\SU0000017\EH PERM.PDF \MIGRATIONS\M\MICKE GROVE\10979\MS-01-24\SU0000017\FINAL MAP.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Kerry Sullivan -2- <br /> CONMIEENTS ON DEVELOPMENTS <br /> MS-01-24 <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. Irrevocable Offer of Dedication to result in a 25-foot wide right-of-way from the centerline of <br /> Micke Grove Road to the property line shall be required across the frontage of APN 059-210- <br /> 37. (A$280.00 fee currently is required for processing per Development Title Table 9-240.2. <br /> In addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication.) (The fee due will be based on the current fee schedule.) <br /> (Development Title Section 9-1150.5(b)) <br /> 3. Irrevocable Offer of Dedication to result in a 67-foot wide right-of-way from the centerline of <br /> Eight Mile Road to the property line shall be required across the frontage of APN 059-210-37. <br /> (A$280.00 fee currently is required for processing per Development Title Table 9-240.2. In <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication.) (The fee due will be based on the current fee schedule.) <br /> (Development Title Section 9-1150.5(b)) <br /> 6. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br /> 7. Requirements for construction of improvements shall be noticed by a statement on the <br /> Parcel Map. <br /> (Subdivision Map Act Section 66411.1) <br /> 8. C Drainage from each Parcel shall be retained on-site by a retention basin(18-inch maximum <br /> depth) and shall be noticed by a statement on the Parcel Map. The volume of on-site drainage <br /> required shall be specified for each parcel on the Parcel Map. <br /> (Development Title Section 9-1135.9) <br /> 9. This development is subject to reapportionment under the San Joaquin Area Flood Control <br /> Agency Assessment District No. 96-I (Flood Protection Restoration Project). An application <br /> requesting the reapportionment of the unpaid portion of the assessment, along with payment of <br /> the reapportionment fee, shall be provided prior to recording the Parcel Map. <br /> 10. Access for Parcel B shall be provided from Micke Grove Road. <br /> BN:sh <br />
The URL can be used to link to this page
Your browser does not support the video tag.