My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002309 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
11011
>
2600 - Land Use Program
>
UP-93-01
>
SU0002309 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:10 AM
Creation date
9/6/2019 10:11:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002309
PE
2626
FACILITY_NAME
UP-93-01
STREET_NUMBER
11011
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05921028
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11011 MICKE GROVE RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MICKE GROVE\11011\UP-93-01\SU0002309\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Health Division's requirements for septic tank design or construction <br /> standards. <br /> 6.3.1 Assumptions for the Phase 2 Expansion <br /> This subsection presents assumptions for the Phase 2 expansion of the property. <br /> The assumptions are used in the calculations of liquid and nitrogen loading presented in <br /> Appendix F. The assumptions for the Phase 2 expansion are as follows: <br /> • The liquid loading rate is 45 gallons/person-day; <br /> • The nitrogen loading rate is 11 .5 g N/person-day; <br /> • Maximum church gatherings will not exceed 250 people. The associated <br /> waste will result in liquid and nitrogen loading equivalent to 0.5 day (i.e., <br /> 22.5 gallons/person and 5.75 g N/person) for those 250 people on the day <br /> of that gathering; <br /> • Four people will occupy the facility 5 days per week from 8:00 A.M.; until <br /> 5:00 P.M. The associated waste will result in liquid and nitrogen loading <br /> equivalent to 0.75 person/day (i.e., 33.75 gallons/person-day, and 8.63 g <br /> N/person-day) for those 5 days; and <br /> • One additional gathering of 25 people will occur one evening per week. The <br /> associated waste will result in liquid and nitrogen loading equivalent to 0.25 <br /> person/day (i.e., 11 .5 gallons/person, and 2.88 g N/person) for that <br /> evening. <br /> 6.3.2 Liquid Loading — Phase 2 Expansion <br /> Based on the assumptions presented above, estimates for the liquid loading were <br /> calculated as shown in Appendix F. The Phase 1 liquid loading was estimated as <br /> approximately 2,025 gallons/week. The larger gathering which will accommodate 250 <br /> people should produce an average of approximately 6,525 gallons/week. <br /> 6.3.3 Nitrogen Loading — Phase 2 Expansion <br /> Based on the assumptions listed in Section 6.3.1 , nitrogen loading calculations for <br /> the Phase 2 expansion were completed and are included in Appendix F. The total <br /> nitrogen loading for one week is estimated at 1 .68 kilograms (3.7 pounds) of total <br /> nitrogen. On an annual basis, this would total 192 pounds of total nitrogen. <br /> SAC 125.12 1 1 <br /> DAMES & MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.