Laserfiche WebLink
geographical distribution of the congregation of church members consists of I I% of the congregation <br /> living on the north-western side of Interstate 205 and south of Grant Line Road, 33% of the <br /> congregation living on the south-eastern side of Interstate 205 and north of Eleventh Street, and 56% of <br /> the congregation living south of Eleventh Street. <br /> TRIP GENERATION <br /> A forecast of the traffic volumes expected to be generated by the project site were calculated based upon <br /> information contained in the Institute of Transportation Engineers (ITE) publication Trip Generation 5th <br /> Edition and February 1995 Update to the 5th Edition. Table 3 contains a listing of the applicable trip <br /> _ generation rates. Table 4 contains the expected trip generation volumes for weekday daily and peak hour <br /> (AM and PM) periods, as well as Sunday daily and project peak hour periods. The project's Sunday <br /> peak-hour of trip generation is expected to occur between 9:00 A.M. and 1:00 P.M. (Source: ITE Trip <br /> .. Generation, Fifth Edition.) For the study intersections, the "Sunday peak hour of traffic" is expected to <br /> occur between 10:00 A.M. and 11:00 A.M. For worst-case analysis, the Sunday peak hour of background <br /> traffic and Sunday peak hour of project trip generation were assumed to occur concurrently between <br /> 10:00 A.M. and 11:00 A.M. <br /> TABLE 3 <br /> TRIP GENERATION RATES <br /> (Unit of Descriptor: per 1000 sq. feet) <br /> PPE Sunday Project <br /> Land Land- ADT AM Peak Hour PM Peak Hour Peak Hour <br /> Use Use Code Weekdav Sunday In Out Total In Out Total In Out Total <br /> Church 560 9.76 36.59 0.49 0.30 0.79 0.43 0.36 0.79 3.96 6.40 10.36 <br /> Source: ITE Trip Generation, Fifth Edition. <br /> TABLE 4 <br /> TRIP GENERATION VOLUMES <br /> Sunday Project <br /> Quantity ADT AM Peak Hour PM Peak Hour Peak Hour' <br /> Land Use (sq. ft.) Weekday Sundav In Out Total In Out Total In Out Total <br /> _ Church 16,400 160 600 8 5 13 7 6 13 65 105 170 <br /> Total"New Trips" 160 600 8 5 13 7 6 13 65 105 170 <br /> Note: 1. For modeling worst-case impacts at the project's driveway intersections with Muddle Road, a 75%parking oc=;p= .vas <br /> assumed during the project's Sunday peak hour, resulting in 225 trips entering and 225 trips tearing the project during <br /> the Sunday peak hour. This rate (although higher than the ITE recommended rate) was applied for a conservative <br /> analysis. <br /> TRIP DISTRIBUTION AND ASSIGNMENT <br /> The assignment of project related traffic to the adjacent roadway system was based upon the <br /> _ distribution of existing church congregation, existing travel patterns, and the geographical location of <br /> the proposed project (in relation to the existing roadway system). Based upon discussions with the <br /> applicant, the directional trip distribution presented in Figure 4A was assumed for the project's Sunday <br /> peak hour of trip generation. The trip distribution presented in Figure 4A was also assumed acceptable <br /> for weekday AM and PM peak hour periods. <br /> Trinity Baptist Church Project Page 9 <br /> Traffic Study <br />