My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009661
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MIDDLE
>
13400
>
2600 - Land Use Program
>
UP-96-0002
>
SU0009661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 4:44:15 PM
Creation date
9/6/2019 10:11:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009661
PE
2656
FACILITY_NAME
UP-96-0002
STREET_NUMBER
13400
Direction
W
STREET_NAME
MIDDLE
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
21204002
ENTERED_DATE
6/12/2013 12:00:00 AM
SITE_LOCATION
13400 W MIDDLE RD
RECEIVED_DATE
6/12/2013 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MIDDLE\13400\UP-960002\SU0009661\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frontage and Roadway Improvement Agreement or a Secured Deferred Frontage and Roadway <br /> Improvement Agreement with a deposit equivalent to the estimated construction costs prior to <br /> approval of the improvement plan. <br /> DevelopmeF#Title Table 9 240.2, in additi9R to a GOPY of the Grant Deed a <br /> 15 GO (Development Title Section 9-1150.2) <br /> g. The Traffic Impact Mitigation Fee shall be required for each phase of this development. The fee <br /> is due and payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R 95 650 R-00-433) <br /> h. The Regional Transportation Impact Fee shall be required for each phase of this development <br /> The fee is due and payable at the time of building permit application The fee will be based on <br /> the current schedule at the time of payment (Resolution R-06-38) <br /> L The developer shall provide drainage facilities and meet the requirements of San Joaquin Countv <br /> Development Standards to prevent the increased runoff release rate of storm water from <br /> discharging onto other properties and to prevent offsite sediment transport Retention basins <br /> shall be fenced with six(6) foot high chain link fence or equal when the maximum design depth is <br /> 18 inches or more. Required retention basin capacity shall be calculated and submitted along <br /> with a drainage plan for review and approval prior to release of each building permit <br /> (Development Title Section 9-1135) <br /> j. All Merm dFaipage Funqff shall be FE)ta Red OR the site, OF teFminal drainage shall be prey ded. <br /> k. The revised traffic study dated May 1999 requires the following improvements to be provided: <br /> (1) Stop sign controls and street lights (outside the road right-of-way) shall be placed at all three <br /> entrances prior to issuance of any additional certificates of occupancy. <br /> (2) A 12 foot, two-way left turn lane shall be constructed along the frontage of Middle Road from <br /> the west driveway to approximately 300 feet east of the east driveway prior to issuance of <br /> any additional certificates of occupancy. Additional right-of-way shall be dedicated if <br /> necessary. <br /> I. All improvements shall be in conformance with the current Improvement Standards and <br /> Specifications of the County of San Joaquin. Improvement plans and specifications shall be <br /> submitted These improvement plans and specifications are subject to plan check field <br /> inspection fees and must be approved by the Department of Public Works (Development Title <br /> Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> m. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> n. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. A final Site Plan is <br /> required upon submittal of verification. <br /> o. All new construction and substantial improvement of any structure shall be elevated a minimum of <br /> Conditions of Approval - 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.