Laserfiche WebLink
F <br /> content at the time of ripping is critical and should not be too wet or too dry71n��a be perpendicular(east to west)to the surrounding land contour and only witd/native soil interface. After ripping and before emplacement of the peat ma, it is imperative that no equipment be driven over this area. <br /> C. CALCULATION OF MOUND DIMENSIONS <br /> BASAL LOADING RATE <br /> Due to the long-term acceptance rate (LTAR) anticipated, a conservative basal loading rate employed for design purposes. Consequently, a loading rate figure of 0.33 gallons/ftZ/day w <br /> used. <br /> HYDRAULIC LINEAR LOADING RATE <br /> From the percolation tests and direct observation of the soil from the infiltration test, it was <br /> evident that there was both vertical and lateral flow of water. A linear loading rate of 15 <br /> gallons/lineal foot/day will be used. <br /> SAND MEDIA/GRAVEL BED SPECIFICATIONS AND LOADING RATE <br /> The filter media is a sand material that underlies the gravel bed. The sand media should be tested <br /> by an engineering laboratory, or be certified by the sand supplier before emplacement. A sieve <br /> analysis (ASTM C-33 Specifications) should demonstrate the sand media material must not have <br /> more than 20%(by wt.) of material greater than 2 mm dia. and no more than 2% (by wt.)passing <br /> the No. 200 sieve. Effective Diameter (d10) should be 0.20 to 0.30 mm with a Uniformity <br /> Coefficient(D60/Djc) of approximately <4. The sand media loading rate complying with the <br /> specifications above is 1.6 gpd/ft2. The gravel bed on top of the sand media shall also be tested <br /> for conformance with the following size distribution: 3/8 in. washed pea gravel to 1.5 in. washed <br /> drain rock. A geotextile filter fabric must be placed over the top of the drain rock bed as noted on <br /> the Design Plans. <br /> AGGREGATE ABSORPTION AREA(A) <br /> A= 1.700 MAX ADF Based on Sundays A= 1063 ft'(use 1500 fig; 15 ft wide x 100 ft long) <br /> 1.6 gpd/f(from above) <br /> BASAL AREA WIDTH(A+I+.J) <br /> A+I+J=Linear Loading Rate=Basal Loading Rate(Based on Long-Term Acceptance Rate-LTAR) <br /> = 15 gals/day/ft-0.33gallons/ft2/day <br /> =46(say 50 ft)ft <br /> Use A= 18 ft, I= 15 ft and J= 18 ft <br /> MOUND DEPTHS <br /> Peat Material=4 in. <br /> Washed Sand= 12 in. <br /> Aggregate Absorption Area thickness=9 in. <br /> (6 in.of aggregate below the laterals, 1 in.for pipe height and 2 in.for cover over pipe=9 inches) <br /> Thickness of Topsoil(Fill and Cap)over the Aggregate Absorption Area = 12 in. <br /> Thickness of Topsoil(Fill and Cap)on the sides of the mound system=6 in. <br /> 14 <br /> Chesney Consulting <br />