Laserfiche WebLink
DATE AUG/2016 <br /> BRAWN BY ' <br /> RAS <br /> CHECKED BY DC ' <br /> MIDDLE ROAD 01 18' 15, 18, DB NO. SOU HWIHDS <br /> 1 <br /> 30' FROM E.O.P. 6" SOIL COVER FILTER FABRIC DE <br /> NEW :., <br /> MOUND .. :.•. ; 4. 1. I <br /> 01 <br /> 4" PEAT MATERIAL <br /> 12" WASHED SAND v o <br /> 130' INSPECTION TUBES °� a <br /> 9" WASHED DRAIN ROCK SCARIFIED NATIVE SOIL SURFACE _ CC <br /> ULuU <br /> 1" DIA. SCH. 40 PVC LATERAL (4) z o v <br /> EQUALLY SPACED 3' APART <br /> � o ~ <br /> EXISTING 10, -20 ' o <br /> MOUND RESERVE SYSTEM AREA: ELEVATION VIEW N <br /> MOUND SYSTEM <br /> INSTALL BALL---,(-,, 100, NEW AREA= •S•T• <br /> VALVE TO 6500 SQ. FT. NN S <br /> CLOSE OFF <br /> EXISTING MOUND RESERVE AREA= <br /> 5,000+2000= TOP VIEW BOTTOM VIEW �orEs <br /> 7,000 SQ. FT. Iq/\'R�) 4.STANDARD <br /> EPTICTRETE 200 (No.3 TANK) <br /> TOARTMENT <br /> �IA�OI\/.\ �_/\�//I�1� STANDARD SEPTICTANK(No.3 TANK)TWO <br /> INSTALLED FOLLOWING THE EXISTING TWO-1,600 <br /> _501— GALLON TANKS(TANKS Nos.l&2) <br /> 5000 SQ. FT. <br /> 2.POLYOUTLETS OF-122 SEPTIC TANKS FILTER INSTALLED 0 <br /> NEW 1,200 GALLON,TWO COMP. nv ixnw AT OUTLETS EPERIODC MAINTENANCE. FILTERS <br /> p WILL REQUIRE PERIODIC MAINTENANCE. Z <br /> o TANK. SECOND COMPARTMENT «� �L _T 3.ORENCO•BIOTUBE PROPAK TO BE INSTALLED J <br /> IN SECOND COMPARTMENT OF SEPTIC TANK No.3. <br /> TO BE PUMP CHAMBER ® — "5 Oe PART NUMBER FT32S4-36AR(DEMAND DOSING). W �w <br /> DISCHARGE ASSEMBLY PART No.HD100IV). u) a a mCD CID <br /> M <br /> p war nn lU wm run esa nvc eve - = N1mi�nn lssm� (FILTER ON BIOTUBE WILL REQUIRE PERIODIC Z W 1- <br /> iro n�rKeeiml Q it Q (aa m,rv. .erry MAINENTANCE. O N X V <br /> p x ce,awx yrq„ <br /> EXISTING 1,600 GALLON TANKS (2) SYSTEM IN BIOTUBE. PART NUMBER 4. DUPLEX,ON-DEMAND IP 3009NG 11, U = DO U <br /> iSINGLE PHASE,I2OV,30 GPM. W Z O Z, N <br /> Oa LY <br /> I S.S.I.E.RHOMBUS EZ SERIES•DUPLEX CONTROL Z O <br /> p h� } 1 Ixua PANEL,PART N UMBER EZS41W114X6ASACIOEI5. N <br /> [KK <br /> �6.SET HIGH WATER UEVELAtARM APPROX.26" Lu <br /> FROM <br /> ALLOW FOR <br /> S RGECAPACITY. <br /> APAANK No. PUMP CHAMBERTOS <br /> �HehPi a v APPROX. <br /> OB SURGE CAPACL MIFF FLOAT " <br /> SPARING=8".GAB,1" 4 MINGALS IN <br /> FLOAT V <br /> oFrcn a„m, al <br /> SPACING=8".1"=8 GA15IN PUMP CHAMBER. <br /> 7.INSTALL BALL VALVE AT POINT W HERE EXISTING <br /> r FORCE MAIN BECOMES CENTER-FEED MANIFOLD. <br /> � H9 CONTINUE FORCE MAIN NORTH TO NEW MOUND SYSTEM. <br /> OihxayNli. 90e Nep <br /> 8. NEW MOUND SYSTEM WILL CENTER FEED 2" <br /> MANIFOLD WITH 1"DIA.PRESSURIZED LATERA <br /> IS TO <br /> PL-122 HOUSING HAVE 1/8"ORIFICES SPACED FIVE FT APART.ORIFICE <br /> PART SHIELDS INSTALLED OVER ORIFICES. RESIDUAL HEAD <br /> PART NO.-30142 TO BE FIVE FT AND OBSERVED BY EHD.90 DEGREE <br /> ELECTRICAL SWEEPS(TURN-UPS)INSTALLED IN <br /> PLAN VIEW IRRIGATION(CHRISTY)BOXES AT ENDS OF LATERALS WITH 4lotessi <br /> 'SCREW-ON CAPS. MOUND SYSTEM CANNOT BE DRIVEN 6a D• Cb w <br /> ON OR USED AS STORAGE. INSTALL BARRICADES AROUND VA. OO L C' <br /> MOUND SYSTEM,E.G.,RAILROAD TIES OR EQUIVALENT. <br /> N W SEPTIC TANK / MOUND SYSTEM INSPECTIONPI �� AA 9.REVIEW ATTACHED NOTES ON MOUND SYSTEM <br /> L 4 <br /> LL BIOTUBE CONSTRUCTION DETAILS, u O. 79 <br /> N.T.S TUBE HOUSING <br />