My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010975_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MIDDLE
>
13400
>
2600 - Land Use Program
>
UP-96-0002
>
SU0010975_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 5:09:51 PM
Creation date
9/6/2019 10:11:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0010975
PE
2656
FACILITY_NAME
UP-96-0002
STREET_NUMBER
13400
Direction
W
STREET_NAME
MIDDLE
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
21204002
ENTERED_DATE
7/15/2016 12:00:00 AM
SITE_LOCATION
13400 W MIDDLE RD
RECEIVED_DATE
7/15/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MIDDLE\13400\UP-960002\SU0010975\SS NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FISoeTptic <br /> ED PLAN NOTES - SOUTHWINDS CHURCH <br /> m contractor responsible for setting installation of new 2,000 gallon, two <br /> t septic tank near the new Worship Center Building. Exact location will be <br /> provided by general contractor. Responsible for connection of inlet tightline and outlet <br /> tightline to existing tightline connected to existing tanks. <br /> 2. Install new 1,200 gallon tank after existing two 1,600 gallon tanks. <br /> 3. Transport and manifold lines to be 2 in. dia. PVC Sch. 40 <br /> 4. Volumes of Mound System construction material: <br /> Peat Material: 1,950 cu ft; 72 cu yds <br /> Washed Filter Sand: 7,700 cu ft; 287 cu yds <br /> Washed Drain Rock: 1,125 cu ft; 42 cu yds <br /> Mound Cap Soil: 5,850 cu ft; 217 cu yds <br /> Filter Fabric: 4,750 sq ft <br /> 5. Center-feed manifold with laterals connected by cross-construction. <br /> Four 1" dia., Sch. 40 PVC laterals from manifold to the north and four laterals to the south, per <br /> plan drawings. Each lateral to be 50 ft long. <br /> 6. Electrical 90' "turn-up"sweeps at the distal ends of each lateral to allow bottle-brush type <br /> cleaner to clean entire length of lateral to manifold. Install 90' electrical sweep at east end of <br /> manifold for manifold cleaning. Each turn-up sweep to have threaded caps on the ends. <br /> 7. Install each of the turn-up sweeps in Christy boxes with the box lids at final grade. <br /> 8. Install orifice shield on each of the 1/8 inch dia. orifices, spaced five ft apart along each lateral. <br /> 9. Mound side slopes to be -3:1 <br /> 10. Install two inspection tubes per plan drawings. <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.