Laserfiche WebLink
TABLE OF CONTENTS <br /> 7LINTRODUCTION ....... .. . ............ ... ... . . . .......... .. ............ . . . . . . . . . .... 1 <br /> H. SOIL SUITABILITY STUDY FINDINGS........... .. ... . . . . .................. ... . . . . . . 2 <br /> A. SUBJECT PROPERTY AND SURROUNDING STUDY AREA INFORMATION .......... 2 <br /> B. SOIL PHYSICAL CHARACTERISTICS AND ANALYTICAL TEST RESULTS .... ...... 3 <br /> C. PERCOLATION TEST RESULTS .... .... .......... ...... . . . . . . . . ... .... . . . . ...... 4 <br /> D. GROUNDWATER INFORMATION . . . . . . . . .. ............ . . .... .... . . . ............ 5 <br /> CALCULATION OF ALKALINITY REQUIREMENTS FOR NITRIFICATION <br /> MOUNDING ANALYSIS <br /> E. SURFACE WATER INFORMATION ............ ... . . . . ............... . .. ..... . . . . 7 <br /> CLIMATIC DATA: RAINFALL VERSUS EVAPOTRANSPIRATION <br /> M. NITRATE LOADING STUDY FINDINGS .......... . . .. . . . . . ...................... . . . . . S <br /> A. WASTEWATER FLOW PROJECTIONS AND CHARACTERISTICS........... . .. . . . . . 9 <br /> B. CALCULATED NITRATE-NITROGEN LOADING . . . .. ....... ... . . ..... . . . . . .. . . . . 1 I <br /> TV. MOUND SYSTEM DESIGN CRITERIA ......... ...... . . . . . . . . . . . . . . . . . . ... . . . 12 <br /> A. SEPTIC TANKS AND DOSING CHAMBER ........ ....... . . . . . . . . . . . . . . . . . . . .. . . . 12 <br /> B. SITE PREPARATION ......... . . ... . ... ................ . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> C. CALCULATION OF MOUND DIMENSIONS .............. . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> D. OPERATIONAL COMPONENTS .... ... ................. . . . . . . . . . . . . . . . . . . . . . . .. 15 <br /> E. MONITORING ....... ............. . ... . ............... . . . . . . . . . . . . . . . . . . . . . . .. 16 <br /> V. CONCLUSIONS, RECOMMENDATIONS,MAINTENANCE .. . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> VI. LIMITATIONS . .. ...... .. . . ............ .... .. . . . ........ ................. ....... . . . . IS <br /> VII. REFERENCES . . . . . ... . . . . . ..... ....... .... .... . ................................. . . . 19 <br /> VIII. APPENDICES .... . . . . . . . . .... .. . ................. .. . .... . . ......................... . 20 <br /> ATTACHMENT A: DESIGN PLANS AND SPECIFICATIONS <br /> ATTACHMENT B: ANALYSIS OF EXISTING WASTEWATER MANAGEMENT SYSTEM REPORT <br /> APPENDIX A: SITE PLAN,S.C.J. PARCEL VIEWER AND GOOGLE AERIAL PHOTO MAPS(SSS§ 1.3, 1.4) <br /> APPENDIX B: SOUTHWINDS CHURCH DEMOGRAPHICS AND FIXTURE UNIT COUNT <br /> APPENDIX C: SOIL PROFILE CHEMICAL ANALYSES OF NEW PRIMARY DISPOSAL FIELD <br /> APPENDIX D: PERCOLATIONIINFILTRATION TEST LOCATION AND RESULTS WITH LOG OF BORING <br /> APPENDIX E: EFFLUENT ANALYSIS <br /> APPENDIX F: PUMP SELECTION DATA <br /> APPENDIX G: CHAIN OF CUSTODY FORMS(SSS§4.6) <br /> Chesney Consulting <br />