Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-84 <br /> Engineering News Record. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 6. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in <br /> in a fifty-five (55) foot wide right-of-way from the centerline of Moffat Boulevard to the <br /> property line across the parcel's frontage. (A $280.00 fee currently is required for <br /> processing}ger Development Title Table 9-240.2 in addition to a copy of the Grant Deed <br /> and a legal description of the parcel to be offered for dedication.) (The fee due will be <br /> based on the current fee schedule.) <br /> (Development Title Section 9-1150.5) <br /> 7. The frontage improvements for Moffat Boulevard shall be constructed in conformance <br /> with the standards for one-half of a 110-foot right-of-way Major Arterial roadway. The <br /> construction of the frontage improvements will be deferred upon execution by the owner <br /> of a Deferred Frontage and Roadway Improvement Agreement or a Secured Deferred <br /> Frontage and Roadway Improvement Agreement with a deposit equivalent to their <br /> estimated construction costs prior to approval of the Improvement Plan. (A $325.00 fee <br /> currently is required for processing per Development Title Table 9-240.2 in addition to a <br /> copy of the Grant Deed and an estimate for the required frontage improvements. The <br /> estimate shall be prepared by a Registered Civil Engineer with a typical section drawing <br /> on a form to be supplied by the Department of Public Works and submitted to the <br /> Department of Public Works for approval. As an option, the Department of Public Works <br /> will prepare the drawing and estimate for an additional fee of$140.00.) (The fee due will <br /> be based on the current fee schedule.) <br /> (Development Title Section 9-1150.2) <br /> GK:BN:ap <br />