Laserfiche WebLink
!� AN ESOP COMPANY <br /> DW <br /> ROBERT H . LEE & ASSOCIATES , INC . <br /> ARCHITECTURE ENGINEERING ENVIRONMENTAL SERVICES <br /> 9937 NORTH McDOWELL BOULEVARD • PETALUMA, CALIFORNIA 94954-911 O (707) 765-1660 <br /> Mailing Address: P.O. Box 750908. Petaluma. CA 94975-0902 Fax (707) 765-9908 <br /> BRIAN F.21TA 21 February 19% <br /> ArcM1itact ,p,y(k /■p^wr ($�9 yp� q■ �y, <br /> JOHN W.JOHNSON Mr. Mike Higgins , ■ ® E a'I ,i. V <br /> ArcM1ltect !MMus M®II�y plC� <br /> JOHN 6. HICKS San Joaquin County Environmental Health <br /> Arnhitect 304 East Weber Street FEB 2 31996 <br /> CECIL A.Arrh,ecStockton, <br /> c Box 388 ENVIRONMENTAL HEALTH <br /> Stockton, CA 95201-0388 <br /> JAMES H.RAY PERMIT/SERVICES <br /> Civil Engineer <br /> RE: SHELL OIL PRODUCTS COMPANY <br /> 7700 MORELAND COURT <br /> STOCKTON, CA <br /> RHL JOB #6788.10 <br /> Dear Mike, <br /> Enclosed is a preliminary site plan of the proposed car wash located behind the existing <br /> service station and the site plan from the previous construction that was done in 1987. <br /> The following are questions or concerns that will have a direct impact to the project. <br /> 1. Is the entire area in the southeast corner required for the leach field? Would the <br /> County (or the City) have any records indicating requirements for the existing <br /> and/or future leach field? <br /> 2. Per our previous conversation, paving is not allowed over the existing leach field, <br /> are there any other considerations for paving that would be allowed? <br /> 3. Is there any type of 'variance" that would allow paving or building on the <br /> existing/future leach field? What would the requirements be? <br /> 4. Can the existing septic tank be moved to another location within the leach field <br /> area? <br /> 5. Per the City and County Public Works Departments the storm drain and sewer <br /> line corrections are not available in the immediate area. Are there any off-site or <br /> alternatives for the drainage pond other than expanding or trenching the existing <br /> pond? Could there be expansion in to the "future" leach area? <br /> You comments and assistance regarding this project are greatly appreciated. If you have <br /> any questions or need additional information, please contact me or Gloria Hicks at (707) <br /> 765-1660. <br /> Sincerely, <br /> Melinda Lin Spisak <br /> Job Captain <br /> f:\wp\6788.10\higgins.mis <br /> MARIETTA, GA SACRAMENTO. CA BELLEVUE, WA LA HABRA. CA <br />