Ms. Aguirre <br /> March 25, 2014 <br /> Page 2 <br /> • Increase in impervious surface area due to project construction presents the <br /> potential for increased drainage from the project site to the I-5 right of way and <br /> Department drainage facilities. It will need to be determined if project <br /> construction would cause an increase in runoff to the existing State facilities. The <br /> applicant will need to ensure that there will not be an increase in new construction <br /> peak volume runoff from the current pre-constiuction amount. <br /> • Any change in use or further development of this project should be resubmitted <br /> for our review. At that time additional comments will be provided by the <br /> Department regarding the impacts created by the additional proposed <br /> development or change in use. <br /> If you have any questions,please contact Barbara Hempstead at(209) 948-3909 (e-mail: <br /> Barbara Herr, stead:ii'dot.ca.gn)or myself at(209) 941-1921. <br /> Sincerely, <br /> TOM DUMAS, CHIEF <br /> OFFICE OF METROPOLITAN PLANNING <br /> U` <br /> "Callrans improves mobility across California" <br />