Laserfiche WebLink
PA-02-530 (SA)REVIS* �ftw <br /> Page 2 of 2 <br /> D. Construction of individual sewage-disposal-system(s)under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the <br /> findings of the Soil Suitability Study(San Joaquin County Development Title, Section 9- <br /> 1110.3 & 9-1110.4). <br /> E. Construction of individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development(San Joaquin <br /> County Development Title, Section 9-1115.3). <br /> F. Construct water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Department (San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial,managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R.,Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br />