Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07-043 (SA) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $780.00 per 1000 gross square foot of building <br /> designated as Industrial. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 7. All new construction shall meet current floodplain building standards including elevating the finish floor of all <br /> buildings along with all service equipment to a minimum of 24 feet NGVD 1929. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:DG:av <br /> P\COM1AfENiS\SA\"2W7TA-U'70 3 APPLICAnON.wpd <br />