My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011908 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
800
>
2600 - Land Use Program
>
PA-1800150
>
SU0011908 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:31 AM
Creation date
9/6/2019 10:16:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011908
PE
2666
FACILITY_NAME
PA-1800150
STREET_NUMBER
800
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330-
APN
23903008, 23903014
ENTERED_DATE
8/22/2018 12:00:00 AM
SITE_LOCATION
800 W MOSSDALE RD
RECEIVED_DATE
8/20/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MOSSDALE\800\PA-1800150\SU0011908\SS_NL STUDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FA <br /> SUITABILITY STUDY <br /> nding Septic System Information <br /> Application Permits on rile with the Environmental Health Department reveals there <br /> e Application for Repairs/Additions to septic systems on Mossdale Road exclusively, <br /> 40 Mossdale Road. This can be considered a very low number of Repairs/Additions' <br /> Replacements, however, considering the low septic system density, this is plausible. <br /> Soil testing was conducted on samples retrieved from a single, exploratory boring. The boring;was <br /> drilled near the center of the primary disposal area, as denoted on the Percolation Test Form. <br /> Physical and analytical chemistry testing were conducted on the samples obtained, discussed belo%c. <br /> _ I <br /> B. Soil Physical Test Results: <br /> Standard Penetration Tests, Particle Size Analysis and Percolation Testing <br /> Soil physical testing began during the drilling procedures by using the Standard Penetration Test <br /> (SPT). It is known that the_referenced etnbankntent was constructed by the Brow_ n Sand Conmpanc <br /> with spoils of undesirable soil material, primarily clay and silt. <br /> The attached Logs of Borings for both holes illustrate the number of blows needed to advance the <br /> split spoon sampler, one foot(ASTM D-1586). SPT results for the Exploratory Boring in the area <br /> of the proposed filter bed indicate stiff cla soil at 5,feet At 10 CqS_ rte s9ii iS�ha1d• The silt <br /> soil at 15 feet is medium dense, and the silt soil at 20 feet, which can be considered the capillary <br /> fringe is a loose,.or soft soil <br /> Soil samples were retrieved during the SPT test from the five, 10, 15, and 20 foot depths. Particle <br /> Size Analysis was done on the three samples by A&L Laboratories of Modesto tinder the attached <br /> Chain of Custody. Laboratory USDA c-lassilications reveal the undealying s�altsms��tsisS9C�t�)a) <br /> loam,,loam.and silt loam soils, In addition to USDA classifications, the Unified Soil Classification <br /> Syst-cm describes,tbc soil samples (also denoted,on the Field Percolation Test Form) as silty, lean <br /> clay, and a silt. These soil classifications are summarized in the Table 1. Page 4. <br /> The second physical tests to be conducted were percolation tests in the location of the primary filter <br /> bed, as described: On December 15, 2004, one pert test boring of 38 inches and one deeper test <br /> boring at 82 inches (7 feet) were drilled with a B-24 Mobile Drill Rig. The sidewalls of the borings <br /> W <br /> ere scored with a pry-bar and the loose material removed with a hand auger. Two inches of line <br /> gravel was placed at the bottom and three-inch perforated PVC pipe was inserted into each hole. <br /> Both test borings were pre-saturated with water, approximately 24 hours before the start of testin_. <br /> On December 16, 2004, percolation testing commenced for the two borings. There was <br /> ` k approximately ]inches of standing pre-soak water in both borings. Each boring was refilled to <br /> approximately six inches of head water and the percolation tests were conducted over a four-hour <br /> period to induce maximum soil saturation. Test results reveal a failing rate of 250 minutes per inch <br /> (nmpi) for the 38 inch boring and a failing rate of 150 mpi for the 84 inch deep boring. Conscqucnlly- <br /> these failing percolation rates require that the septic system for this project be engineered. <br /> Page -3- <br /> - Chesnet• Const/tin <br />
The URL can be used to link to this page
Your browser does not support the video tag.