Laserfiche WebLink
mitigation measures determined necessary during this consultation shall be implemented by <br /> the project proponents. <br /> Mason's lilaeopsis rose mallow, Delta tule pea and Delta mudwort. These species are <br /> considered widely distributed species by the SJMSCP, and dedication of conservation <br /> easements is the preferred option for mitigation. If these species are found in the project <br /> area, the possibility of establishing a conservation easement or in-lieu land dedication shall <br /> be evaluated. If neither establishment of a conservation easement nor in-lieu land dedication <br /> is feasible, no mitigation (in addition to payment of SJMSCP fees)shall be required. <br /> Bristly sedge and blue skullcap. These species are considered narrowly distributed by the <br /> SJMSCP, and dedication of conservation easements is the preferred option for mitigation. If <br /> these species are found in the project area, the possibility of establishing a conservation <br /> easement shall be evaluated. If dedication of a conservation easement is not a feasible <br /> option, the SJMSCP requires a consultation with the permitting agency representatives on <br /> the Technical Advisory Committee to determine the appropriate mitigation measures. These <br /> may include seed collection or other measures and would be determined on a population <br /> basis, taking into account the species type, relative health, and abundance. After the <br /> appropriate mitigation has been determined, it shall be implemented by the project <br /> proponents. [Mitigation Measure 4.10-2] <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD) prior to the issuance of grading <br /> permits for the project. <br /> 37. Conversion of Burrowing Owl Habitat: If SJCOG determines suitable habitat is present on <br /> or adjacent to a given project site,the following SJMSCP incidental take avoidance and <br /> minimization measures shall be implemented: <br /> a. Burrowing owls shall be discouraged from entering or occupying construction areas by <br /> employing one of several methods outlined in Section 5.2.4.15 of the SJMSCP. These <br /> include retention of tall vegetation, regular discing of the site, or use of chemicals or traps <br /> to kill ground squirrels; <br /> b. Pre-construction surveys for burrowing owls shall be conducted where project <br /> construction activities would occur within 75 meters of suitable habitat(based on SJCOG <br /> review). The survey shall be conducted within 2 weeks of the beginning of construction. <br /> If burrowing owls are found, the following measures shall be implemented: <br /> c. During the nonbreeding season (September 1 through January 31), burrowing owls <br /> occupying the project site shall be evicted from the project site by passive relocation, as <br /> described in the DFG's Staff Report on Burrowing Owls(DFG 1995). <br /> d. During the breeding season(February 1 through August 31), occupied burrows shall not <br /> be disturbed and shall be provided with a 250-foot protective buffer until and unless the <br /> Technical Advisory Committee,with the concurrence of the permitting agencies' <br /> representatives on the Technical Advisory Committee, or a qualified biologist approved <br /> by the permitting agencies, verifies through noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles from the occupied burrows are foraging <br /> independently and are capable of independent survival. After the fledglings are capable <br /> of independent survival, the burrow can be destroyed. [MM 4.10-51 <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD) prior to the issuance of grading <br /> permits for the project. <br /> 38. Conversion of Common Nesting Raptor Sites: Potential nest sites for all tree-nesting <br /> species are scattered throughout much of the College Park site, but are concentrated along <br /> Grant Line Road and at Grant Line Village. Suitable nesting habitat for northern harrier is <br /> provided by all field crops and fallow fields. During the SJMSCP application process,SJCOG <br /> will determine whether that speck project site supports suitable nesting habitat. If SJCOG <br /> determines suitable habitat is present on or adjacent to a given project site, the SJMSCP <br /> 9 <br />