My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011430
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23323
>
2600 - Land Use Program
>
PA-0500143
>
SU0011430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:52:53 PM
Creation date
9/6/2019 10:16:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011430
PE
2611
FACILITY_NAME
PA-0500143
STREET_NUMBER
23323
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906040
ENTERED_DATE
7/19/2017 12:00:00 AM
SITE_LOCATION
23323 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/17/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\23323\PA-0500143\SU0011430\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
incidental take avoidance and minimization measures described below for nesting raptors shall <br /> be implemented.Additional measures below shall be implemented to avoid loss of active nests <br /> of common raptor species, which are not covered under the SJMSCP but are protected under <br /> the California Fish and Game Code.The project applicants shall retain qualified biologists to <br /> conduct all pre-construction surveys. <br /> White-tailed Kite. If project construction begins during the nesting season (February 15— <br /> September 15), pre-construction surveys shall be conducted to investigate all potential <br /> nesting trees on the project site(e.g., especially tree-tops 15-59 feet above the ground in <br /> oak, willow, eucalyptus, cottonwood, or other deciduous trees), whenever white-tailed kites <br /> are noted on-site or within the vicinity of the site during the nesting season. A setback of 100 <br /> feet from white-tailed kite nesting areas shall be established and maintained during the <br /> nesting season for the period encompassing nest building and continuing until fledglings <br /> leave nests. This setback applies whenever construction or other ground-disturbing activities <br /> must begin during the nesting season in the presence of nests that are known to be <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing. <br /> Northern Harrier. If project construction begins during the nesting season (February 15— <br /> August 31), pre-construction surveys shall be conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of areas of project activity. The survey shall be <br /> conducted within the 2 weeks before construction begins. A setback of 500 feet from <br /> northern harrier nesting areas shall be established and maintained during the nesting season <br /> for the period encompassing nest building and continuing until fledglings leave nests. This <br /> setback applies whenever construction or other ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that are known to be occupied. Setbacks shall <br /> be marked by brightly colored temporary fencing. <br /> Common Raptors. If project construction begins during the nesting season (February 15— <br /> August 31), pre-construction surveys shall be conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of areas of project activity. The survey shall be <br /> conducted within the 2 weeks before construction or tree removal begins. If any active nests <br /> are found, a setback of 200 feet from each nest shall be established and maintained during <br /> the nesting season for the period encompassing nest building and continuing until fledglings <br /> leave nests. This setback applies whenever construction or other ground-disturbing activities <br /> must begin during the nesting season in the presence of nests that are known to be <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing. [MM 4.10-61 <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD)prior to the issuance of grading <br /> permits for the project. <br /> 39. Conversion of Other Special Status Nesting Bird Habitat: During the SJMSCP application <br /> process, SJCOG will determine whether that specific project site supports suitable habitat for <br /> loggerhead shrike, California horned lark, or tricolored blackbird. If SJCOG determines <br /> suitable habitat is present on or adjacent to a given project site, the following SJMSCP <br /> incidental take avoidance and minimization measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> Loggerhead Shrike. If project construction begins during the nesting season (April 1—August <br /> 31), pre-construction surveys shall be conducted during the nesting season in suitable <br /> nesting habitat within 100 feet of areas of project activity. The survey shall be conducted <br /> within the 2 weeks before construction or tree removal begins. A setback of 100 feet from <br /> loggerhead shrike nesting areas shall be established and maintained during the nesting <br /> season for the period encompassing nest building and continuing until fledglings leave nests. <br /> This setback applies whenever construction or other ground-disturbing activities must begin <br /> during the nesting season in the presence of nests that are known to be occupied. Setbacks <br /> shall be marked by brightly colored temporary fencing. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.