My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011925
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0500838
>
SU0011925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:55:37 AM
Creation date
9/6/2019 10:17:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011925
PE
2656
FACILITY_NAME
PA-0500838
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906065, -66, -67
ENTERED_DATE
9/11/2018 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
9/23/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0500838\SU0011925\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Developers and contractors shall comply with Ordinance No.4162"Street Opening <br /> and Pavement Restoration Regulations". <br /> B. When any portion of an arterial street is to be included in a development's construction <br /> plans,then all of the buried utilities that are ultimately planned to be within the <br /> improvement area shall be installed as part of the street improvement project regardless <br /> if any of the utilities are required for any phase of the development associated with the <br /> street construction. Conduits or sleeves may be installed in lieu of the buried utility if <br /> approved by the MHCSD. <br /> C. Any phased development shall install all"in-tract" utilities required to serve it <br /> development. In addition, if any future adjacent or nearby phases of the development, <br /> or adjacent Neighborhoods, will depend on obtaining service from such utilities, then the <br /> utility lines shall be sized to serve these future developments. Any utility lines that are <br /> intended to be used by an adjacent development or Neighborhood shall be installed up <br /> to the phase or Tentative Map boundary line to make it available for future extension. To <br /> recoup all or a porton of any over sizing costs, the developer may request the MHCSD <br /> to process a reimbursement agreement pursuant to the MARA. <br /> D. When public utilities are to be located outside public rights-of-way but within the <br /> Tentative Map boundary,the developer shall provide public utility easements for these <br /> utilities. The easements shall be shown on all Final Maps and parcel maps. <br /> E. Prior to the submittal of improvement plans for the development, the developer shall <br /> submit to the MHCSD composite schematic plans for in tract storm drains, sanitary <br /> sewers,and water distribution facilities. <br /> F. Electrical transformers within residential Neighborhoods shall be in underground vaults, <br /> subject to MHCSD andModestoIrrigation District(MID)requirements. The developer <br /> shall pay for any incremental costs relating to undergrounding transformers not paid for <br /> by MID. Transformers located in the downtown area, commercial and industrial areas <br /> may be placed above ground provided they are aesthetically designed and/or shielded <br /> by landscaping subject to MHCSD and MID requirements. <br /> 26. Wastewater Treatment Plant: <br /> A. Under the direction of the MHCSD,the applicant shall fund, design and construct a <br /> phased expansion of the wastewater treatment plant(WWTP)of sufficient capacity, no <br /> less than 1.5 mgd,to serve Tract No. 3481 prior to issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity <br /> and also recognizing that the MHCSD is not a party to and has no control over such <br /> agreements, bonding for construction shall be provided prior to approval of the first final <br /> map and beginning of construction shall be at the discretion of the General Manager. <br /> Issuance of building permits shall cease if construction does not begin when directed by <br /> the General Manager. <br /> B. The developer shall extend existing pipelines to the project site as shown on the Master <br /> Sanitary Sewer Plan. The developer shall also extend the sanitary sewer system <br /> pipelines to the Grant Line Village frontage road as directed by the General Manager in <br /> order to serve the residents of Grant Line Village. Interim treated wastewater land <br /> disposal capacity and piping system to serve the proposed project shall be provided by <br /> the developer until such time as the river discharges commence. Initiation of State <br /> Permit Application for land application of the treated discharge requirement shall parallel <br /> the treatment plant capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A shall meet <br /> the requirements of the Regional Water Quality Control Board (RWQCB)effluent <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.