My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011925
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0500838
>
SU0011925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:55:37 AM
Creation date
9/6/2019 10:17:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011925
PE
2656
FACILITY_NAME
PA-0500838
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906065, -66, -67
ENTERED_DATE
9/11/2018 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
9/23/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0500838\SU0011925\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) Fire flow and hydrants will be provided for the proposed project by the use of Appendix III-A <br /> and III-B of the California Fire Code. <br /> c) Fire sprinkler systems shall be installed according to Article 10 of the California Fire Code <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and the California Electrical Code. <br /> d) Fire department access roads shall be in accordance with Section 902.2 of the California <br /> Fire Code and the standard adopted by the San Joaquin County Fire Chiefs Association. <br /> e) This planning application will require a fire access road to be completed before the County <br /> Surveyor's Office will file the map for record. Please contact Fire Prevention at 209-468- <br /> 3380 to schedule an inspection of the completed road. <br /> f) This project shall comply with the San Joaquin County Development Title Section 9- <br /> 1150.18, Road Naming Procedures. Please contact the Community Development <br /> Department at 468-2193 to complete this process prior to requesting Fire Department <br /> approval. <br /> g) AA undeveloped parcels or portions of undeveloped parcels which are created as a result of <br /> this planning application shall remain free of weeds, debris, or any other combustible <br /> vegetation such as abandoned orchards or vineyards throughout the year to the <br /> satisfaction of the Fire Jurisdiction Having Authority. (CFC 1103.2.40) <br /> vu. LAMMERSVILLE ELEMENTARY SCHOOL DISTRICT(Staff Contact <br /> Doris Unsod, 209-836-7400) <br /> 1. The developer shall enter into full mitigation agreements with the Lammersville Elementary <br /> School District(LESD). [Master Plan Implementation 5.1.3(j)_] <br /> Timing: Condition shall be met prior to approval of the first Final Map. <br /> 2. The portion of the K-8 school site designated on the Tentative Map shall be dedicated to <br /> LESD as required in the school agreement between the applicant and Lammersville <br /> Elementary School District. [SPIII Implementation Measure 5.2.3 (n).] <br /> Timing: Condition shall be met prior to approval of the first Final Map or as set forth in the <br /> school agreement. <br /> S. The school funding agreements between the applicant and Lammersville Elementary School <br /> District and Tracy Unified School District shall be implemented to provide interim and <br /> permanent funding for school facilities, as evidenced by certificates of compliance from these <br /> jurisdictions stating that the developer has complied with funding requirements as per the <br /> agreements. [SPIII Implementation Measure 5.2.3(o).] <br /> Timing: Condition shall be met prior to approval of Final Maps. <br /> vin. TRACY UNIFIED SCHOOL DISTRICT(Staff Contact Denise Wakefield, <br /> 209-830-3245) <br /> 1. The developer shall enter into full mitigation agreements with the Tracy Unified School <br /> District(TUSD). [Master Plan Implementation 5.1.3 (j).] <br /> Timing: Condition shall be met prior to approval of the first Final Map. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.