Laserfiche WebLink
L�Claytoif <br /> Ms.Devra Lewis Page 4 <br /> RWQCB Clayton Project 70-03759.00 <br /> July 31, 2004 <br /> import clean soil for backfilling of the trench. The backfilled soil will be placed in lifts <br /> and compacted by vibratory or roller equipment to adequately compact the soil in each <br /> trench. No compaction testing is proposed. <br /> 3.4 SOII, BORINGS <br /> After the former pipeline alignment has been established in the field, Clayton will <br /> contract with a California-licensed drilling contractor to complete the subsurface <br /> investigation. Clayton will mark the proposed boring locations and the site boundaries <br /> with white paint and notify Underground Service Alert(USA) to clear an area <br /> approximately 100 feet wide along the former pipeline route at least 48 hours prior to <br /> commencement of any subsurface fieldwork, as required by law. <br /> Clayton will obtain necessary soil boring permits for the proposed drilling activities from <br /> the San Joaquin County Environmental Health Department(SJCEHD) for each land <br /> parcel. In addition,Clayton will provide the SJCEHD with a copy of the above- <br /> referenced written access agreements. <br /> The subsurface investigation is designed to complete a total of 336 soil borings at a <br /> spacing of 25 lineal feet. Soil samples will be collected to a total depth of approximately <br /> 6 feet below the ground surface(bgs). Additional soil borings to deeper depths(first <br /> encountered groundwater)will be completed in areas where evidence of petroleum <br /> hydrocarbon impact(staining,odors, etc.)in the shallow subsurface soils is discovered. <br /> Previous investigations to the northwest of the area indicate that the depth to groundwater <br /> is between 30 and 35 feet bgs. Due to hard drilling conditions with depth at the site, <br /> Clayton proposes utilizing a truck mounted Geoprobe rig to advance the shallow soil <br /> borings, and a truck mounted hollow stem auger drill rig to advance any deeper borings. <br /> �. Clayton assumes that the surface-soil conditions are adequate to support typical pickups <br /> and four-wheel drive vehicles during the sampling and surveying portions of the work. If <br /> special site conditions limit accessibility,then special equipment will have to be located <br /> to conduct the sampling. <br /> 3.4.1 Shallow Subsurface Investigation <br /> Clayton will contract a California-licensed(C-57) driller to operate truck-mounted <br /> GeoProbe direct push equipment and advance the proposed shallow boreholes every 25 <br /> feet. Soil cores will be obtained using a core barrel sampler, which are approximately 4 <br /> feet long and 2 inches in diameter. The core barrel sampler contains a plastic acetate <br /> liner that retains a relatively undisturbed soil core from which soil samples are collected. <br />