Laserfiche WebLink
Cn 0 <br /> � a <br /> d M College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> ' Implementation&_Verification <br /> g Implementation <br /> Mitigation Measure Timing/Schedule Date <br /> c Responsibility Action Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> H Land Uses construction, and Community <br /> fDrn The College Park developers shall implement the During design Phase Development <br /> ° following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> v Irrigation District(BBID)canals from proposed conjunction with the <br /> 0 urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E—Chevron <br /> o easement that bisects the project site. <br /> ' < Identify an agricultural buffer of no fess than 100 <br /> 0 feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> v line. <br /> n <br /> m <br /> _ <br /> v <br /> o m <br /> � p <br />