Laserfiche WebLink
Km <br /> 0 <br /> n' D <br /> o. College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Comaleted <br /> P <br /> n 4.24 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> o Act Contracts disposal developer <br /> ? The project applicants shall implement the following <br /> mitigation measure: <br /> 3 < At such time as the interim land disposal of <br /> treated wastewater at the Potnbo property is <br /> 3 discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e., feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> a < Before development,the project developers shall developer, and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> n water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> CD <br /> irrigation canals shall be approved by BBID. <br /> CD <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> Resources developer,and in <br /> If discovery of unlmown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> o the construction site where the discovery was made archaeologist,if <br /> Cf) y shall be halted.The College Park developers or needed. <br /> C) construction contractor shall contact the San Joaquin <br /> County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> narchaeologist acceptable to County staff shall be <br /> 5 notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />