Laserfiche WebLink
N n <br /> do <br /> CD <br /> d m College Park at Mountain House Specific Plan III <br /> c m Mitigation Monitoring and Reporting Program <br /> o = Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> Completed <br /> �• Health Department shall identify"no further <br /> o actions required'before project construction <br /> y access at these locations. <br /> fD < Phase I Environmental Site Assessment(ESAs) <br /> Cn <br /> shall be prepared by qualified hazardous materials <br /> experts for areas in Grant Line Village that are the <br /> subject of future development proposals before <br /> d construction in these areas.The ESAs shall be <br /> reviewed and approved by the County <br /> Environmental Health Department.Any <br /> recommendations made in the ESAs(monitoring, <br /> Phase II testing,mitigation,etc.)shall be <br /> implemented. <br /> < Project grading,excavation,and other earth- <br /> moving activities directly adjacent to the off-site <br /> parcel where the December 4,2003 crude oil <br /> release took place shall not occur until it has been <br /> verified,either by the assessment currently being <br /> conducted by the RWQCB or separate soil and <br /> ogroundwater sampling commissioned by the <br /> = College Park developers,that the contamination <br /> o associated with the incident has not migrated to <br /> o the College Park site.If the contamination has <br /> migrated to the College Park site,it shall be fully <br /> remediated to the satisfaction of the County <br /> n Environmental Health Department before project <br /> construction activities in the contaminated area. <br /> 'g < Project construction activities at hazardous <br /> _ <br /> materials sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of the EIR)shall occur only after <br /> 3 mo any contamination that may exist at these sites has <br /> y been fully remediated to the satisfaction of the <br /> County Environmental Health Department,the <br /> status of the sites has been changed to"no further <br />