Laserfiche WebLink
K m <br /> U5o <br /> co D <br /> o' <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule ResponsibilityActon Date <br /> m <br /> Completed <br /> a action required"in the regulatory agency <br /> databases, and the facilities that are the source of <br /> o any contamination have been removed in <br /> �. accordance with applicable regulations. The <br /> project developers may attempt to advance the <br /> oabove, if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> 3 the property owners and regulatory agencies,and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of <br /> structures on the project site and off-site <br /> infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> lead-based paint.Demolition,renovation,or <br /> modification of any structures identified as <br /> d containing asbestos or lead-based paint shall be <br /> performed by a licensed asbestos and lead-based <br /> paint abatement contractor in accordance with <br /> c applicable regulations. <br /> E; 4.94 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> U) c < The College Park developers shall have a developer and a <br /> preliminary Endangerment Assessment(PEA) qualified hazardous <br /> o` Cn prepared by a qualified hazardous materials materials expert;in <br /> W ID <br /> consultant for the school located near the Lucky J consultation with CDE <br /> 9' 0 Dairy, if required by California Department of and DTSC <br /> o <br /> :2 Education(CDE). The PEA shall be prepared in <br /> > > accordance with CDE and Department of Toxic <br /> '� = Substances Control(DTSC)requirements and <br />