Laserfiche WebLink
Cn 0 <br /> W 0 <br /> _ _ <br /> CD <br /> I <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> 0D Implementation&Verification <br /> o — Implementation <br /> K <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> x Section 5.2.4.15 of the SJMSCP.These include <br /> Nretention of tall vegetation,regular discing of the <br /> CD site,or use of chemicals or traps to kill ground <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> 0 shall be conducted where project construction <br /> d activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> v implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> 94 <br /> o During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> o' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> m concurrence of the permitting agencies' <br /> n representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> _0 have not begun egg laying m6or(2)Juveniles <br /> E3 mo from the occupied burrows are foraging <br /> independently and are capable of <br /> independent survival.After the fledglings <br />