Laserfiche WebLink
o <br /> c College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> a <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> ResponsibilityAction Date <br /> � Completed <br /> CL are capable of independent survival,the <br /> m burrow can be destroyed. <br /> a4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> < The College Park developers shall request <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> °D concentrated along Grant Line Road and at Grant <br /> Line Village.Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> process, SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> CD <br /> habitat.If SJCOG determines suitable habitat is <br /> R. present on or adjacent to a given project site,the <br /> 9 SJMSCP incidental take avoidance and <br /> minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> d. measures below shall be implemented to avoid <br /> = loss of active nests of common raptor species, <br /> to 0which are not covered under the SJMSCP but are <br /> m protected under the California Fish and Game <br /> ` in Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> cm < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br />