Laserfiche WebLink
vo <br /> m B College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation 8 Vedtioatiorr <br /> Mitigation Measure Timing/Schedule <br /> Da <br /> Responsibility Action de <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> w standards,the County shall extend the standard of <br /> m LOS D to the segment of Byron Road east of Grant <br /> Cn <br /> Line Road. <br /> CD <br /> �. Because Byron Road is a major regional arterial <br /> serving the area, the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> w 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> m The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> o measures are included in the Guide forAssessing and <br /> = Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> o repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> the SJVAPCD to implement the current version of the <br /> measures at the time individual development <br /> applications are received by the County for <br /> development under College Park <br /> 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> M <br /> 1Contaminants(TACs) begins and during conjunction with the <br /> 3 ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />