Laserfiche WebLink
� m <br /> v <br /> v g <br /> g College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Mitigation Measure Timing/ ImplementationSchedule ResponsibilityAction Date <br /> Completed <br /> n ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> g uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> o particulate matter(PM)may occur and to review <br /> a methodologies that may become available to <br /> estimate the risk The developers shall implement <br /> 3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> nwi The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> m Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures asrecormnendedinthe <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> m, are already included in the proposed project design <br /> =r and/or are already required by the MHMP and by <br /> w N mitigation in the M1IMP and Delta College EIRs. <br /> CD <br /> o <br /> n v <br /> c 51 <br />