Laserfiche WebLink
rn 0 <br /> N O <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o °= Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule <br /> 47 aResponsibility Action Completed <br /> 4.13. NOISE <br /> 0 4.13-1 Noise--Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> CD <br /> W < Limit project construction activities to the hours developer <br /> CCDD between 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> v Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> — receptors.Temporary acoustic barriers may be <br /> d installed around stationary equipment,if <br /> 0 necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD, in <br /> Noise and during conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> m <br /> identified below into the project design. <br /> a Commercial,Office,and Industrial Uses <br /> CD Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> -0 exceedance of 55 dBA L,y during daytime hours <br /> 19 p (7;00 a.m. to 10:00 p.m.)or 50 dBA Lw during <br /> ig 3 nighttime hours(10:00 pan-to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.hi addition,design and <br />