Laserfiche WebLink
L. The commercial collector street, "R" Drive, shall be in conformance with the MHCSD <br /> Design Manual, Chapter 3, Pages 22-23, and shall comply with all Community <br /> Approvals and MHCSD Standards. Timing: prior to approval of the First Final Map. <br /> M. All residential lots that are siding or backing onto a Collector Street shall have Masonry <br /> Walls and Landscaping, installed within a 5 foot wide Landscape Easement, back of <br /> sidewalk on the Collector Streets. Landscaping and masonry walls shall be designed <br /> consistent with all Community Approvals including applicable provisions of the MHCSD <br /> Design Manual and MHCSD Standards, and shall be reviewed and approved by the <br /> MHCSD General Manager concurrently with the adjacent street Improvement Plans. — <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to first building permit. <br /> N. Landscaping and architectural design of all parcels designated as HOA or Landscape <br /> Maintenance District, shall be consistent with all Community Approvals including <br /> applicable provisions of the MHCSD Design Manual and MHCSD Standards. The <br /> design plans associated with each phase of the development shall be completed and <br /> approved by the MHCSD General Manager prior to the approval of the Final Map for <br /> that phase. <br /> O. Masonry walls shall be installed at the property line between residential properties and <br /> all public or private parcels. View Fencing or no fencing may be permitted in locations <br /> where residences face the Open Space as deemed appropriate by the MHCSD. Plans <br /> to be consistent with all Community Approvals including applicable provisions of the <br /> MHCSD Design Manual, MHCSD Standards, and any applicable Special Purpose Plan. — <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to first building permit. <br /> Walls or fencing may be constructed at the same time as house fencing. <br /> P. All landscape pedestrian through-block connections shall be a minimum of 30 foot width. <br /> Larger width may be required in specific areas as deemed necessary by MHCSD. <br /> Timing: prior to approval of the First Final Map. <br /> Q. Pathways within pedestrian through-block connections or landscape corridor shall be a <br /> minimum of 8 foot width and shall be consistent with all Community Approvals including <br /> applicable provisions of the MHCSD Design Manual and MHCSD Standards. <br /> R. Community Wall alignments along Grant Line Road and De Anza Boulevard, adjacent to <br /> residential properties, shall undulate and shall be consistent with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual and MHCSD <br /> Standards. Property lines shall follow the alignment of the Community Walls. A <br /> continual five-foot maintenance easement shall be provided on the residential lot side of <br /> the community wall and shall be recorded with the final map. Timing: prior to First Final <br /> Map. <br /> S. Indicate all Landscape Setback areas within Commercial and Industrial zones as <br /> required by the Master Plan. Timing: prior to approval of the First Final Map. <br /> 33. AIB Neighborhood Parks: <br /> A. The neighborhood parks identified within Specific Plan III shall be dedicated to MHCSD <br /> or an offer of dedication to the MHCSD shall be recorded with the First Final Map. <br /> Timing: condition shall be met with approval of First Final Map of Neighborhood A/B. <br /> B. The entire A/B Neighborhood Park shall be designed consistent with all Community — <br /> Approvals including applicable provisions of the Parks, Recreation and Leisure Plan and <br /> the MHCSD Design Manual. The design of the park shall be reviewed and approved by <br /> MHCSD. Timing: condition shall be met prior to approval of First Final Map. <br /> C. The MHCSD General Manager may allow the Neighborhood Park to be constructed in <br /> phases to be consistent with usage demand and other public interest considerations. <br /> Final design of the first phase of the Neighborhood Park shall be completed before its <br /> 26 <br />