My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction. Construction of the first phase of the neighborhood park shall begin no <br /> later than the time at which 50% of the dwelling units for Neighborhood A/B (separate <br /> from Neighborhood D)or school attendance area, whichever is sooner, have been <br /> issued a building permit. The Park shall be completed no later than the time at which <br /> 80% of dwelling units for the neighborhood have been issued building permits. <br /> Completion time may be modified by the MHCSD General Manager to reflect <br /> construction, weather, budget, or other public interest contingencies. <br /> D. A formal agreement for joint use of parks and recreation facilities with adjacent K-8 <br /> schools shall be required prior to construction of the park. (Implementation Measure <br /> 7.2.2.3d) <br /> E. Lot"S", portion of the A/B Neighborhood Park shall be constructed or bonded for at the <br /> discretion of MHCSD. Timing: construction shall begin prior to issuance of building <br /> ` permit of the 143`d residential unit and the park shall be completed prior to issuance of <br /> building permit of the 228th residential unit. Completion time may be modified by the <br /> MHCSD General Manager to reflect construction,weather, budget, or other public <br /> interest contingencies. <br /> 34. South Community Park: <br /> A. Community Park land identified within Specific Plan III shall be dedicated to MHCSD on <br /> a minimum of a pro rata basis, as determined by MHCSD, with the applicant to pay fair <br /> share of all park improvements. Timing: prior to approval of First Final Map. <br /> B. The entire South Community Park shall be designed to a 30% design completion level <br /> consistent with all Community Approvals including applicable provisions of the Parks, <br /> Recreation and Leisure Plan and the MHCSD Design Manual. The design of the park <br /> shall be reviewed by both the DCRC and MHCSD and approved by the MHCSD. <br /> Timing: condition shall be met prior to issuance of the first residential building permit <br /> within Tract 3481. <br /> C. The MHCSD General Manager may allow the South Community Park to be constructed <br /> in phases to be consistent with usage demand and other public interest considerations. <br /> Final design of the first phase of the South Community Park shall be completed before <br /> its construction. Construction of the first phase of South Community Park shall begin no <br /> later than the time at which 50% of the dwelling units permits for Specific Plan III have <br /> been issued a building permit. The Park shall be completed no later than the time at <br /> which 80% of dwelling units for the Specific Plan III have been issued building permits. <br /> Completion time of park phases and/or the entire park may be modified by the MHCSD <br /> General Manager to reflect construction, weather, budget, or other public interest <br /> contingencies. <br /> 35. Open Space Corridor: <br /> A. All in-tract landscaping and utility RAW areas and all other landscape areas within <br /> Specific Plan III that were not in the original Master Plan, the MHCSD Parks, Recreation <br /> �. and Leisure Plan, the TIF or the CFF (January, 2003) as determined by MHCSD, will <br /> require a funding mechanism, such as a Lighting and Landscape Maintenance District, <br /> as determined by MHCSD General Manager. These areas will require establishment of <br /> a maintenance entity or financing mechanism acceptable to MHCSD to provide funding <br /> ` for maintenance of, and if necessary, replacement at the end of the useful life of <br /> improvements including, but not limited to landscaping, pathways, walls, and all <br /> improvements serving or for the special benefit of this subdivision. The financing <br /> �. mechanism shall be completed and adopted by the Board of Directors prior to the <br /> approval of the First Final Map. <br /> B. The design of all Open Space Corridor improvements including paths, alignment, <br /> standards, signage, lighting, and landscaping shall comply with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual. Timing: plans <br /> shall be reviewed and approved by MHCSD prior to issuance of the first residential <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.