Laserfiche WebLink
K m <br /> � o <br /> co' D <br /> College Park at Mountain House Specific Plan III <br /> 0 <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> S Mitigation Measure Timing/Schedule Date <br /> Responsibility Action Completed <br /> cc <br /> nmaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> oduring construction that could be present in <br /> stormwater drainage and non-stormwater <br /> co discharges; <br /> 3 < Specify BMP inspection protocols to ensure that <br /> o the BMPs are effective and ensure that the <br /> B monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> oa measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o_ equipment operation; <br /> `D < Identify measures to prevent or clean up spills of <br /> fD hazardous materials used for equipment <br /> M operation and hazardous waste; <br /> m < Identify emergency procedures for responding to <br /> K spills; <br /> < Identify BMPs that shall be used in all <br /> d. subsequent site-development activities; <br /> as < Identify personnel training requirements and <br /> CO c procedures that will be used to ensure that <br /> CD workers are aware of permit requirements and <br /> 0�U) proper installation and performance inspection <br /> CD <br /> methods for specified BMPs; <br /> n < Identify the appropriate personnel responsible for <br /> supervisory duties related to implementation of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br /> i I I i I I i I I I I I I I i <br />