Laserfiche WebLink
r I r r r r - r r r r r r r r r- r r- r-- r- <br /> Cn 0 <br /> N 0 <br /> m College Park at Mountain House Speck Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> 0 d Implementation <br /> Implementation&Verification <br /> K Mitigation Measure TiminglSchedule Responsibility Action Date <br /> Z c Completed <br /> COPY of the approved S WPPP on the construction <br /> = site. <br /> 0 <br /> W 4.9 PUBLIC HEALTH AND SAFETY <br /> CD <br /> c4.9-1 Public Health and Safety—Possible Exposure to Before and during San Joaquin County <br /> Pre-Existing Hazardous Materials During construction; Environmental Health <br /> Construction Before demolition, Department and the <br /> The College Park developers shall implement the renovation,or Central Valley <br /> following measures: modification of RWQCB,in <br /> < Project grading,excavation,and other earth- structures conjunction with the <br /> moving activities at the project site and off-site developer and a <br /> infrastructure locations shall be monitored at the qualified hazardous <br /> to <br /> County's discretion by qualified hazardous materials expert <br /> materials experts(either qualified County staff or <br /> consultants)for signs of potential pesticide, <br /> hydrocarbon,or other contamination.If the <br /> County or consultants observe soil discoloration, <br /> noxious odors,or other signs of potential <br /> contamination,Phase H testing(excavation, <br /> claboratory testing of soil,possibly groundwater <br /> 0 testing)shall be undertaken,and any <br /> recommendations made by the consultants shall <br /> be implemented. <br /> < The San Joaquin County Environmental Health <br /> Department shall have regulatory authority over <br /> the investigation and clean-up of contamination <br /> 0- from underground storage tank releases and would <br /> CD provide"no further action required" <br /> determinations for that source of contamination. <br /> All aboveground storage tanks(ASTs)and <br /> v underground storage tanks(USTs)at the project <br /> M site shall be removed under the supervision of a <br /> 0 <br /> � � qualified hazardous material expert in accordance <br /> with applicable regulations and removal permit <br />