Laserfiche WebLink
i�: m <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action <br /> Completed <br /> nrequirements from the County Environmental <br /> A Health Department.Dairy waste ponds or any <br /> Do other sources of contamination shall be removed <br /> a. under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> 0 <br /> requirements from the Central Valley RWQCB or <br /> � the California Department of Toxic Substances. <br /> This includes the December 4,2003 crude oil <br /> 3 <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted, any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> CD (i.e.,septic systems,refuse piles,waste ponds, <br /> m electrical transformers containing PCBs)on the <br /> project site and off--site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction. The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> o the above has taken place before issuance of <br /> U) y building permits. If the experts observe potential <br /> soil contamination or noxious odors associated <br /> � cn <br /> CD with these facilities,the soils underlying these <br /> c, facilities shall be sampled and tested by the <br /> n � experts. If the testing reveals contamination,the <br /> m regulatory agencies shall be contacted, any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br /> I I I I I I I I I I I I I I I I <br />