Laserfiche WebLink
rn <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action <br /> Completed <br /> o ► Mobile-Source TAC Emissions—The College <br /> 70 Park applicants for industrial or commercial land <br /> Do uses shall coordinate with the SJVAPCD to <br /> 0 <br /> assess sfmations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> 0 <br /> methodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD, in <br /> o Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> RL <br /> m the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> v are already included in the proposed project design <br /> = and/or are already required by the MHMP and by <br /> mitigation in the MHMP and Delta College E1Rs. <br /> U N <br /> J (p <br /> L rn <br /> N <br /> fl n <br /> G M <br /> C- O <br /> 0 <br /> O p <br /> G � <br /> �G <br />