My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r I r r r r r r r r r r r r r r r r ir <br /> Cn0 <br /> N O <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> 0 Implementation&Verification <br /> � � Implementation <br /> - Mitigation Measure Timing/Schedule Responsibility Action Date <br /> g c Completed <br /> 4.13. NOISE <br /> = 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> CD <br /> Noise conjunction with the <br /> Cn < Limit project construction activities to the hours developer <br /> between 6:00 a.m. and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w <br /> recommendations. <br /> w < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> y installed around stationary equipment,if <br /> necessary. <br /> K 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD, in <br /> 2. Noise and during conjunction with the <br /> ?. The project applicants shall incorporate the measures construction developer <br /> co identified below into the project design. <br /> m <br /> CL Commercial,Office,and Industrial Uses <br /> X Industrial and commercial land uses proposed as part <br /> 0 <br /> � of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,,during daytime hours <br /> M (7:00 a.m.to 10:00 p.m.)or 50 dBA Ley during <br /> 3 nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and <br />
The URL can be used to link to this page
Your browser does not support the video tag.