Laserfiche WebLink
r I IF 1 r r r 1 r IF 1 1 r r r r <br /> Cn n <br /> N 0 <br /> M College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> o n; Implementation Implementation 8 Verification <br /> 0 Mitigation Measure Timing/Schedule Responsibility Action Comapleted <br /> 0 <br /> employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP.These include <br /> yretention of tall vegetation,regular discing of the <br /> CD site,or use of chemicals or traps to kill ground <br /> Cn <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> 0 shall be conducted where project construction <br /> m <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's StaffReport on <br /> Burrowing Owls(DFG 1995). <br /> c <br /> o During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> onot be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> m concurrence of the permitting agencies' <br /> n representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> � have not begun egg laying or(2)juveniles <br /> M0 from the occupied burrows are foraging <br /> y independently and are capable of <br /> 3 independent survival.After the fledglings <br />