Laserfiche WebLink
K m <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action <br /> Completed <br /> W <br /> are capable of independent survival,the <br /> burrow can be destroyed. <br /> m <br /> 0 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> 0 < The College Park developers shall request <br /> 3 coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> _ throughout much of the College Park site,but are <br /> concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> process,SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> CD <br /> habitat.If SJCOG determines suitable habitat is <br /> R- present on or adjacent to a given project site,the <br /> R4 SJMSCP incidental take avoidance and <br /> 0 <br /> minimization measures described below for <br /> 3 nesting raptors shall be implemented.Additional <br /> v measures below shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> W c which are not covered under the SJMSCP but are <br /> m protected under the California Fish and Game <br /> mCn <br /> Code.The project applicants shall retain <br /> ID <br /> a qualified biologists to conduct all pre- <br /> construction surveys. <br /> c < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br /> i i I I I I I I I I i I I I I I I I <br />