Laserfiche WebLink
r r F r r r r r r r r r r r r r r r r <br /> CO 0 <br /> a) O <br /> 3 College Park at Mountain House Specific Plan HI <br /> - Mitigation Monitoring and Reporting Program <br /> fl Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 41 begins during the nesting season(April 1—August <br /> =x 31),pre-construction surveys shall be conducted <br /> yduring the nesting season in suitable nesting <br /> CD habitat within 100 feet of areas of project <br /> W <br /> activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> ' maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> the nesting season(April 1–August 31),pre- <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity.A <br /> setback of 500 feet from California horned lark <br /> and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> nseason for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> CD <br /> setback applies whenever construction or other <br /> a ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> 3 m are known to be occupied. Setbacks shall be <br /> o marked by brightly colored temporary fencing. <br /> B 4.10-9 Biological Resources—Conversion of San Joaquin Before construction SJCOG,in <br />