Laserfiche WebLink
rn <br /> a <br /> College Park at Mountain House Specific Plan III <br /> o <br /> = Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> CL during the nesting season(February 15 August <br /> A 31),pre-construction surveys shall be conducted <br /> oduring the nesting season in suitable nesting <br /> a hahitat within 500 feet of areas of project <br /> cc= activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins. If any active nests are found,a setback of <br /> ig <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> oN ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> MThe College Park developers shall request coverage prior to construction <br /> d under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> Cn <br /> m California horned lark,or tricolored blackbird.If <br /> o` U) SJCOG determines suitable habitat is present on or <br /> adjacent to a given project site, the following <br /> 3 SJMSCP incidental take avoidance and*minimization <br /> n v measures shall be implemented by the project <br /> > applicants in consultation with a qualified biologist. <br /> '7 = < Loggerhead Shrike.If project construction <br />