Laserfiche WebLink
E: m <br /> 0 <br /> �n n <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Date <br /> �. Responsibility Acton <br /> Completed <br /> nat least 5 consecutive days from the time of the <br /> observation,to allow any kit fox occupying the <br /> -moo den to move to another location. If it is not a natal <br /> 7Lor pnnninv den.use of the den can be discouraged <br /> co during this period by partially plugging its <br /> entrance(s)with soil in such a manner that any <br /> 0 <br /> animal can escape easily.The den maybe <br /> destroyed when, in the judgment of a qualified <br /> biologist, it is no longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destruction <br /> shall be in accordance with USFWS <br /> recommendations. <br /> wo < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS. A 250-foot buffer zone shall be <br /> n maintained around natal dens until the biologist <br /> 0 <br /> m determines that the den has been vacated. <br /> m Additional provisions of the Standardized <br /> v <br /> Recommendations for Protection of the San <br /> R" Joaquin Kit Fox Before or During Ground <br /> v <br /> � Disturbance(USFWS 1999),including those <br /> o for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> = for kit fox occupation during construction, <br /> 0 <br /> U) y shall also be implemented. <br /> (D <br /> o` C/) Jurisdictional Waters of the United States Before Construction SJCOG, in <br /> n < The College Park Developers shall implement coordination with <br /> 0 Mitigation Measure 4.10-10. DFG,USACE and/or <br /> 0 -0 RWQCB <br /> c � <br /> x '— 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />