Laserfiche WebLink
r r r r r r r r I r ir r r r r r r r r <br /> rn 0 <br /> NO <br /> W m College Park at Mountain House Specific Plan HI <br /> 5 <br /> m Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action <br /> Completed <br /> 0 <br /> � p <br /> With-Project Conditions on Anticipated Network <br /> = For consistency with previously adopted roadway <br /> ystandards,the County shall extend the standard of <br /> o LOS D to the segment of Byron Road east of Grant <br /> -o Line Road. <br /> CD. Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> v implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> oPollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> o repeated in the"Regulatory Setting"subsection.'Me <br /> � SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> n the SJVAPCD to implement the current version of the <br /> g measures at the time individual development <br /> applications are received by the County for <br /> development under College Parlc <br /> -V 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> M Contaminants(TACs) begins and during conjunction with the <br /> ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />