Laserfiche WebLink
r r r r r r r r r r r r r r r r r r r <br /> Cn 0 <br /> N 0 <br /> mCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> 0cMitigation Measure Timing/Schedule Responsibility Action Completed <br /> = p eted <br /> land uses,the operation of on-site landscape <br /> = <br /> maintenance equipment shall be limited to the <br /> c least noise-sensitive periods of the day,between <br /> CD the hours of 7:00 a.m. and 10:00 p.m <br /> Cn <br /> 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> The project applicants shall implement the measures conjunction with the <br /> identified below. developer <br /> < Before occupancy of the fust residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the E1R)and the northem travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm,or combination thereof.The <br /> exact location,height,and character of the noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County.The sound barrier shall <br /> o reduce outdoor noise levels at the center of the <br /> = front yards of the five existing residences to <br /> 0 below 65 dBA Ldn/CNEL.If Grant Line Road is <br /> g widened at this location subsequent to <br /> construction of the sound barrier but before <br /> v removal of the five residences under Specific <br /> n. Plan 11,the sound barrier shall be relocated,as <br /> required. If the five existing residences are <br /> CD <br /> 0 removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> rno implementation.This mitigation shall be funded <br /> y through fair-share payments by the College Park <br /> 3 developers. <br />