Laserfiche WebLink
K m <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o <br /> Implementation Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> n 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> rD The College Park developers shall implement the developer;in <br /> �. follnwing meacnres- consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> 0 <br /> the first residence proposed under the College consultant <br /> � <br /> Park project along each of the seven arterial <br /> B segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment. The noise barrier may consist of a wall, <br /> berm,or combination thereof. The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> m below 65 dBA L&/CNEL and as close to 60 dBA <br /> m L&/CNEL as feasible. This mitigation shall be <br /> m funded through fair-share payments by the <br /> m <br /> College Park developers. <br /> 0 <br /> 0 <br /> c <br /> m <br /> Z <br /> rn c <br /> CD <br /> � (D <br /> 0 <br /> O O <br /> N O <br /> � O <br /> C. M <br /> � O <br /> C7 � <br /> O p� <br /> c � <br /> �G <br />