Laserfiche WebLink
< < < t ( ( r < ( < t rrIfI' � c � � ftrr <br /> CnC') <br /> d 0 <br /> 0 co College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> _ RL Implementation&Verification <br /> c a Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action <br /> Completed <br /> = p <br /> retention in-lieu of the required expansion of WQBI, <br /> _ <br /> = before development of those portions of <br /> yNeighborhoods B and D to be served by the DeAnza <br /> CD Boulevard and Mountain House Parkway storm-drain <br /> 4� systems. <br /> 4.8 WATER QUALITY <br /> v 4.8-1 Water Quality—Potential Temporary NOI(s)submitted to MHCSD,in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> = The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 401 water quality certification,ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB)statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> — RWQCB NPDES permit for construction dewatering begins <br /> a activity,and obtain any other necessary site-specific <br /> 0 WDRs or waivers issued pursuant to the Porter— <br /> M Cologne Act.As required under the NPDES <br /> stormwater permit for general construction activity, <br /> o the project applicant shall prepare a Stomtwater <br /> � Pollution Prevention Plan(SWPPP)and any other <br /> a) necessary engineering plans and specifications for <br /> o pollution prevention and control.The SWPPP and <br /> other appropriate plans shall: <br /> < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> (BMPs),means of waste disposal, <br /> my implementation of approved local plans,non- <br /> stormwater management controls,permanent <br /> postconstruction BMPs,and inspection and <br />